Introduction: The 2026 Grid Emergency Meets AI Infrastructure In July 2026, the eastern United States is experiencing a punishing heatwave. The PJM Interconnection—the largest US regional grid—is forecasting demand to exceed 166,000 MW, dangerously close to its all-time historical record. Utilities are considering the unthinkable: cutting AI data centers off the grid to preserve...
Why Industrial Facilities Fail IEEE 519 Harmonic Compliance Introduction As industrial facilities become increasingly dependent on variable frequency drives (VFDs), automated production lines, switch-mode power supplies, and renewable energy systems, maintaining good power quality has become more challenging than ever. While these technologies improve efficiency and reduce energy consumption, they...