MV STATCOM for PV Plants: Grid Code Compliance A 60 MW solar plant at the end of a 40 km radial line fails commissioning for one reason: voltage. At noon the inverters push full output into a high-impedance feeder, the point of connection climbs past the upper statutory band, and the utility raises the alarm before the plant earns a day of tariff. The owner installs capacitor banks, the standard f...