Most AHF and SVG quotations are built backwards. A buyer collects a short-circuit level, a transformer rating and a target THDi, then asks three suppliers for a price. The result is a device sized to a guess rather than to the disturbance. A power quality report already contains most of what is needed to size a harmonic filter or reactive compensator correctly, provided the reader knows which colu...
Neutral conductor overheating in a three-phase four-wire system is a zero-sequence problem, so measure harmonic orders first and only then select a filter. A neutral that runs hot while the phases stay comfortably cool is rarely a coincidence. It points to zero-sequence current driven by triplen harmonics, which behaves nothing like a balanced-load calculation predicts. This article follows the or...
Industrial efficiency losses are not always mechanical. A plant can keep every machine healthy and still lose energy, capacity and uptime to harmonics, reactive power and three-phase current imbalance that never appear on a maintenance checklist. VFDs, rectifier-fed equipment and fast-switching electronics make production more efficient while making the network underneath less forgiving. This arti...
SVG sizing for power factor correction cannot be estimated from transformer capacity or a motor nameplate alone. Those figures describe how much load a site could connect, not how much reactive power the load actually exchanges with the supply at the point of common coupling (PCC). A Static Var Generator chosen from nameplate data will either leave the power factor short of target or spend on capa...
Capacitor bank overheating after adding VFDs is a power quality symptom, not a capacitor defect. VFD rectifiers inject harmonic current, the bank offers a low-impedance path at those frequencies, and parallel resonance between the bank and the supply can amplify that current until fuses open, contactors chatter and capacitor cans swell. A capacitor bank supplies reactive power to correct power fac...
Dear Customers and Partners, As China’s National Day approaches, YT Electric would like to express our sincere appreciation to all customers, distributors and partners for your continued trust and support. Please be informed that our office will be closed for the China National Day Holiday from October 1 to October 7, 2026. During this period, responses to emails, technical inquiries and ord...
Transformer Overheating from Harmonics: K-Factor vs AHF Mitigation In heavy industry, large data centers, and plants packed with VFDs and six-pulse rectifiers, a distribution transformer can run within its nameplate kVA and still develop abnormal temperature rise, oil-temperature alarms, or accelerated winding insulation ageing. The usual load-current check misses the frequency content of that cur...
Centralized or Distributed Compensation? How to Place AHF and SVG in Multi-Transformer Facilities In modern industrial complexes, continuous process plants, chemical refineries, automotive manufacturing hubs, and large commercial campuses, electrical power is distributed via multi-transformer substations (often configured as Main-Tie-Main or dual-ended secondary selective substations). A standard ...