The market's preference for the model of "sampling on the high-voltage side and mitigation on the low-voltage side" is not accidental. It is the optimal solution determined by a combination of factors including technical feasibility, economic efficiency, safety, and mitigation effectiveness. The logic behind this can be understood with a simple analogy: A doctor performs a "blood te...