The choice between installing an Active Harmonic Filter (AHF) on the power side (at the Point of Common Coupling - PCC) versus the load side (at the source of harmonics) is a critical design decision with significant technical and financial implications. Here is a detailed analysis comparing both installation strategies. Executive Summary Load-Side Installation (Local Compensation): Targets s...
Part 1: Power Distribution - The "Highway System" for Electricity Power distribution is the final stage in the delivery of electricity from the generation plant to the end-user (homes, businesses, industries). Think of it as the local and regional road network that brings goods from a central warehouse to your doorstep. Key Components of a Distribution System: Distribution Substations: Receiv...